Located in Hov (Greater Oslo), Nordic Blocks AS offers an immediate 3 MW high-density powered-shell capacity block (Scaling site capacity to a 6 MW energized grid connection by Q1 2027) optimized for modern AI & HPC workloads. Powered by 100% renewable energy with a fixed power price for 7/10 years, we deliver the fastest, most cost-effective path to deploy your hardware clusters in Europe.
Strategically located in the NO1 grid zone — Norway's most reliable power supply region — our campus combines immediate power availability with long-term expansion headroom.
6 × 1 MW Møre Trafo transformers step 22 kV down to 400 V and 230V industrial power. The high-voltage line runs directly beneath the property — expansion needs no external civil works.
4 Tbps active fiber capacity with a direct subsea fibre pipeline to New York — low-latency transatlantic connectivity purpose-built for heavy AI model training and synchronization.
200 m from Lake Randsfjorden, the 4th lagest glacial lake in Norway, enabling deep-water cooling designs with PUE as low as ~1.05.
100% renewable Norwegian hydropower. Waste-heat reuse potential to local district heating, aligned with the EU Energy Efficiency Directive.
2,000 m² main hall (8 m ceilings) plus an independently powered 1,000 m²( 5 m ceiling) building — engineered for heavy floor structural loads and high-density electrical distribution from 50 kW up to 100 kW per rack. This provides complete physical isolation for training and inference clusters. All 6 MW of infrastructure are routed independently from one another.
Verified regional grid capacity supports scaling from an edge site to a hyperscale campus without grid-queue delays.
Not a project on paper — a live site with audited history.